Selasa, 25 Juni 2013

NORMAL PROCEDURE EC 120B COLIBRI by Galung_the_Dompax

PREFLIGHT CX

EXTERIOR CX

Station 1
-          Pitot tube                                        : Cover removed – cx condition
-          Sideslip indicator                             : Cx Condition
-          Transparent panel                           : Cx condition
-          Landing gear (crosmembers,
Skids, wear resistant plates)            : Secure – visual cx
-          Front air intake                                 : Blanking cover removed – clear
  (water, snow, foreign objects)

Station 2
-          Doors                                                    : Closed
-          MGB-Engine LH cowling                       : Opening
-          MGB                                                      : Oil level
-          Hydraulic compact unit                           : Oil level
-          Engine                                                   : Oil level
-          Transmission deck & Engine                  : Condition, cleanliness, absence of leaks